无码人妻AV一二区二区三区_欧美性色Aⅴ在线观看_亚洲中文字幕人成乱在线_亚洲国产欧美另类在线

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

油煙凈化器風(fēng)管接駁處的防漏風(fēng)措施

來源:http://norcalcrt.org/     發(fā)布時間:2017-09-06  

  油煙由風(fēng)機吸入靜電油煙凈化器,其中部分較大的油霧滴、油污顆粒在導(dǎo)流板上由于機械碰撞、阻留而被捕集。

  The fume is sucked into an electrostatic fume purifier by a fan, wherein, some larger oil droplets and oil particles are arrested on the deflector for mechanical collision and retention.

  當(dāng)氣流進(jìn)入高壓靜電場時,在高壓電場的作用下,油煙氣體電離,油霧荷電,大部分得以降解炭化

  When the airflow enters the high voltage electrostatic field, the ionization of soot gas and the charge of fog are mostly degraded under the influence of high voltage electric field

  油煙凈化器少部分微小油粒在吸附電場的電場力及氣流作用下向電場的正負(fù)極板運動被收集在極板上并在自身重力的作用下流到集油盤,經(jīng)排油通道排出,余下的微米級油霧被電場降解成二氧化碳和水,終排出潔凈空氣;同時在高壓發(fā)生器的作用下,電場內(nèi)空氣產(chǎn)生臭氧,除去了煙氣中大部分的氣味。

  The role of a few small oil particles in electric field of electric field and flow to the adsorption of positive and negative plates moving electric field were collected at the plate and in the gravity down pan is discharged through the oil drain passage, micron oil mist remaining field degraded into carbon dioxide and water, eventually discharged clean air; at the same time in the high pressure generator under the action of air to generate ozone field, remove most of the smell of smoke.

  1.設(shè)備運行時受到振動將影響設(shè)備正常工作,所以設(shè)備和風(fēng)機的風(fēng)管連接時必須采用軟連接;

  1. when the equipment is running, vibration will affect the normal operation of the equipment, so the connection between the equipment and the fan pipe must be a soft connection;

  2.為保證設(shè)備的凈化效率,各風(fēng)管的接駁處及法蘭位需采取防漏風(fēng)措施;

  2., in order to ensure the purification efficiency of the equipment, the air duct connection and flange position need to take anti leakage measures;
濟(jì)南通風(fēng)管道工程

  3.當(dāng)多臺設(shè)備并聯(lián)使用,由統(tǒng)一的抽風(fēng)機抽風(fēng)的時候,也必須保證分配給各臺設(shè)備處理風(fēng)量的比例接近他們額定處理風(fēng)量的比例。

  3., when multiple units are used in parallel, the ventilation rate should be guaranteed to be equal to the proportion of the rated air handling rate.

  4.為保證設(shè)備的凈化效率,與設(shè)備出入風(fēng)口連接的變徑風(fēng)管要盡量平順夾角≤30度,變徑風(fēng)管前后必須安裝長度比管徑大2.5倍以上的直管;

  4. in order to ensure the purification efficiency of the equipment, to less than 30 degrees angle as smoothly as possible and reducing equipment and outlet pipe connected with the wind, reducing wind pipe must be installed before and after more than 2.5 times larger than the diameter of the length of the straight pipe;

  5.風(fēng)機的出口好保留一段≥1.5D的直管,以減少風(fēng)機的附加阻力;

  5. of the outlet of the fan is best kept straight for a period of not less than 1.5D, in order to reduce the additional resistance of fan;

  6.為保證設(shè)備的凈化效率,設(shè)備應(yīng)工作在負(fù)風(fēng)壓狀態(tài),即風(fēng)機必須裝在設(shè)備的后面,管道復(fù)雜時應(yīng)在前面吸油煙罩加裝引風(fēng)機。

  6., in order to ensure the purification efficiency of the equipment, the equipment should work in the state of negative wind pressure, that is, fans must be installed in the back of the equipment. When the pipeline is complex, the fan shall be equipped with a draft fan in front of the hood.

  本文由油煙凈化器為您提供,我們的網(wǎng)站是:http://norcalcrt.org/我們將以全心全意的熱情為您提供更的服務(wù),歡迎您的訪問!

  This article is provided by the lampblack purifier, our website is: http://norcalcrt.org/, we will wholeheartedly provide you with better service, you are welcome to visit!

上一篇:裝置通風(fēng)管道跨接線的注意事項
下一篇:排煙罩采用斜面設(shè)計結(jié)構(gòu)的原因